Write My Paper Button

WhatsApp Widget

Texas Tech University Transport Lab Report

Share this post on:

Description

Task Group A.

1. Prepare a neat copy of the double T ortho with all the group’s dimensions.

2. Prepare a material take-off of the double T from the ortho, giving the number, type, and size of fittings (e.g 78 ea. 4”-45
deg elbows). Add up the total length of straight pipe in the spool.

The post Texas Tech University Transport Lab Report first appeared on SP Essays.

Share this post on:

Affordable and Dependable Platform for Your Academic Assignments

X