Given the Aircraft Maintenance Hangar Project Details, complete the following:
Step 1: Identify at least eight risks to the aircraft maintenance hangar project.
Step 2: Use the Impact Scale in Figure 7.5 (or create your own scale) and plot the risks on a Risk Severity Matrix (like Fig. 7.7).
Step 3: Develop a Risk Response Matrix (like Fig. 7.8).
Step 4: Create a simple Change Request Form (like Fig. 7.10).
Given the activity’s three-point estimations, calculate the weighted average activity duration.
Use the formula in Appendix 7.1 and calculate the weighted average (te) for each activity.
NOTE: Stop at the weighted average (te) for each activity.